JD Sports Distribution Centre

JD Sports Distribution Centre – Rochdale

Workplace / Commercial EV Charging (Fleet & Depot)


JD Sports logo

MER logo

 

 

Overview

EV Blocks were used as part of a workplace EV charging installation at JD Sports’ Rochdale distribution centre, delivered by Mer.

The project included a mix of AC and DC chargers to support employees and site visitors, while preparing the site for future EV adoption.

 

Highlights

The Rochdale distribution centre operates at full capacity during peak retail periods, including Black Friday, Christmas and New Year, making it difficult to carry out large-scale installation work without disrupting operations.

To address this, EV Blocks foundations were installed during the early groundwork phase, allowing the main charger installation and final connections to take place later with minimal time required on site. This phased approach reduced disruption and ensured the project could be delivered around the site’s operational schedule.

 

Key Outcomes

● 12 chargers installed (10 AC, 2 DC)

● 24 AC outlets and 4 DC outlets delivered

● Completed on schedule with minimal disruption

● Clean, neat installation with improved efficiency

 

Download Full JD Sports Case Study PDF

Product Used:

Product Used:

B600

  • Versatile Ducting: Four entry points for flexible cable management and a tidy finish.
  • Universal Adaptor Plate: Easy updates for future EV charger compatibility.
  • Robust Load Capacity: Handles up to 12.5 tons, ideal for diverse projects.
  • All-Weather Ready: Quick installation in any conditions for faster deployment.

Ready to simplify and future-proof your EV infrastructure? Explore the B600 today!

Questions?

Our sales team can help answer them.