The electric vehicle (EV) revolution is in full swing, driving the need for an efficient and scalable charging infrastructure. To meet this demand, a wide range of charge points have been developed, all requiring one essential element: a high-quality, reliable foundation. EV Blocks provides universal precast concrete bases, offering a revolutionary solution to this challenge.
Discover why architects, specifiers, electrical contractors and EV installers favour EV Blocks.
As the world transitions to electric vehicles, charging infrastructure must be efficient, scalable and future-proof.
EV Blocks® provides the ultimate EV Charger Foundation solution — a precast, universal base designed to eliminate installation delays, reduce costs, and simplify future charger upgrades.
With EV Blocks, installation is faster than ever. No need for on-site concrete pouring, extended curing times, or disruptive excavation — just lower the precast foundation in to place and mount your charger. And when the time comes to upgrade? Simply replace the adapter plate and install your new charger — without ripping up the pavement or road.
Whether you’re a fleet operator, charge point operator (CPO), real estate developer, or car park operator, EV Blocks is the smarter, faster, and more sustainable way to build EV charging networks.
Ready to install. Ready to scale. Ready for the future.
An EV Block is a universal pre-cast concrete foundation specifically designed for both passive and active EV charge point installations. Unlike traditional cast-in-place EV charger plinths, which require on-site formwork, extended curing times, and are heavily impacted by weather conditions, EV Blocks arrive ready to install—saving time, labour, and cost.
Traditional concrete installations are vulnerable to rain, extreme temperatures, and freezing conditions, often leading to costly project setbacks. EV Blocks arrive fully cured and ready to install, keeping your schedule on track with zero downtime.
Designed for universal compatibility, EV Blocks make future upgrades effortless. When it’s time to replace or upgrade an EV charger, simply swap out the adapter plate, no excavation, no disruption and no costly foundation work required. This future-proof design ensures long-term flexibility, making it the best investment for EV infrastructure.
Built for strength and consistency, EV Blocks provide unmatched durability compared to traditional on-site concrete pours. Manufactured under strict quality controls, they offer a reliable, long-lasting foundation that stands the test of time.
Whether you’re installing a single charger or deploying a large-scale network, EV Blocks deliver a faster, cost-effective, and future-ready solution. Eliminate delays, reduce installation costs, and create a foundation that’s built to last—all with EV Blocks®.
View our full range of products for your next EV charge point installation.
Installing EV chargers should be simple, efficient, and built to last. EV Blocks streamline the process with precast foundations that eliminate on-site concrete pouring and long curing times. Ready for immediate installation, they cut project timelines from days to hours, reducing labour costs and ensuring a faster, more efficient rollout of EV charging infrastructure.
Skip concrete-curing wait times and accelerate your EV charger deployment with EV Blocks —the industry’s most efficient and future-proof foundation solution. Unlike traditional cast-in-place concrete bases that require on-site pouring, curing, and costly labour.
Unlike traditional cast-in-place concrete, which creates excess waste and environmental impact, EV Blocks are manufactured in a controlled environment for maximum efficiency and sustainability. By minimizing material waste and optimizing production, we deliver a cleaner, more responsible solution, without compromising durability or performance.
EV Blocks arrive pre-engineered and ready to install, allowing for rapid and seamless charger deployment.
Faster Expansion as EV adoption grows, charging infrastructure must scale quickly. EV Blocks eliminate lengthy concrete curing times, enabling rapid deployment of charging stations. This allows businesses and cities to meet rising demand faster, encouraging more drivers to switch to electric vehicles with confidence.
Reliable Foundations consistency matters. Unlike traditional concrete pours, which vary in quality, EV Blocks are engineered for strength and durability. Their precision manufacturing reduces downtime, enhances charger stability, and ensures a dependable user experience.
Sustainable Impact EV infrastructure should align with sustainability goals. EV Blocks minimize material waste, reduce energy-intensive construction and require less maintenance over time. Their long-lasting design lowers environmental impact, supporting a greener future for EV mobility.
Stay charged up with the latest news from EV Blocks and sign up to our newsletter.