{"id":7119,"date":"2022-08-18T09:30:16","date_gmt":"2022-08-18T08:30:16","guid":{"rendered":"http:\/\/newurl.com\/?p=7119"},"modified":"2025-11-11T13:41:43","modified_gmt":"2025-11-11T13:41:43","slug":"ev-charging-point-installation-challenges-solutions","status":"publish","type":"post","link":"https:\/\/evblocks.com\/uk\/blog\/ev-charging-point-installation-challenges-solutions\/","title":{"rendered":"EV Charging Point Installation \u2013 Challenges &#038; Solutions"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">There are several challenges and areas for improvement within the installation of EV charging block foundations. One such area for improvement is the time it takes to complete freestanding EV charging point installations. Cutting this time down to just one day would be highly beneficial for construction and redevelopment projects, reducing project time and resource pressures.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<h2><b>EV Charging Foundation Base Process<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">There are currently two main ways of installing EV charging foundations &#8211; the most common is free pour concrete, but the modern, and more efficient way is to use pre-cast bases to reduce cost and time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<h2><b>Wet Pour Concrete \u2013 Casting An EV Plinth In Situ<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The prevalence of free pour concrete for EV charging base installation makes a quick turnaround difficult to achieve and consistent timelines a challenge.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This methodology is problematic for electrical and for groundworks contractors as it takes time for the concrete to dry before the installation can be completed. This can often take around four days, and since the way concrete sets can often be unpredictable, some foundations may have to be repoured before the charge point is ready to go live.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Longer timeframes and multiple site visits are expensive and make it harder to resource and complete jobs in line with aggressive budgets\/timelines. More site visits than are necessary also causes more CO2 emissions from the extra transport.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This is all exacerbated during winter when this drying time can become difficult to predict due to the cold\/freezing conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<h2><b>Our EV Charging Point Installation Solution<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The completion of freestanding EV charging point installations within one day is possible, but it does require a move away from the use of free pour concrete for the foundations.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">We created a solution for this whilst installing EV chargers within our own electrical contracting business &#8211; we developed a proprietary pre-cast concrete base with a uniform structure and finish. That way, concrete is pre poured and set in predictable conditions, so that the finished block can simply be taken to the installation site and dropped in with ease.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">These are designed to be lightweight with a universal adapter plate which suits a variety of different EV chargers on the market, meaning that you can install your EV charging point without even knowing which electric vehicle you are opting for yet.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<h2><b>Pre-Cast EV Foundation Installation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">To get the quickest, most consistent, and carbon efficient results, the process should be simple. At EV Blocks, our process has two stages:<\/span><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Dig out and secure the foundation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Install the charging point on top<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\"> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1210\" src=\"https:\/\/evblocks.com\/wp-content\/uploads\/2021\/03\/xl-step-1@2x-300x300.png\" alt=\"Step 1 of an EV Block Installation\" width=\"300\" height=\"300\" srcset=\"https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-1@2x-300x300.png 300w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-1@2x-150x150.png 150w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-1@2x-600x600.png 600w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-1@2x-100x100.png 100w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-1@2x.png 631w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1211\" src=\"https:\/\/evblocks.com\/wp-content\/uploads\/2021\/03\/xl-step-2@2x-300x300.png\" alt=\"Step 2 of an EV Block Installation\" width=\"300\" height=\"300\" srcset=\"https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-2@2x-300x300.png 300w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-2@2x-150x150.png 150w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-2@2x-600x600.png 600w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-2@2x-100x100.png 100w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-2@2x.png 631w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1212\" src=\"https:\/\/evblocks.com\/wp-content\/uploads\/2021\/03\/xl-step-3@2x-300x300.png\" alt=\"Step 3 of an EV Block Installation\" width=\"300\" height=\"300\" srcset=\"https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-3@2x-300x300.png 300w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-3@2x-150x150.png 150w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-3@2x-600x600.png 600w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-3@2x-100x100.png 100w, https:\/\/evblocks.com\/uk\/wp-content\/uploads\/2021\/03\/xl-step-3@2x.png 631w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/span><\/p>\n<h2><\/h2>\n<h2><b>The Benefits Of A Pre Cast Foundation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A pre-cast solution adds consistency and predictability to EV installation projects that isn\u2019t as present with wet pour methods.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">The quality and finish of the blocks is simple but uniform, and the lower risk of delays and quality issues makes one day installations achievable.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">The pre-cast solution is also hollow, reducing its carbon footprint (by lowering the amount of concrete used), when compared to the free pouring method. This helps installers align their processes to the industry\u2019s image and goals; electric vehicles were popularised with the aim of reducing carbon emissions, so the installation of their charging points should reduce emissions too.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; There are several challenges and areas for improvement within the installation of EV charging block foundations. One such area for improvement is the time it takes to complete freestanding EV charging point installations. Cutting this time down to just&#8230;<\/p>\n","protected":false},"author":374,"featured_media":3036,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7119","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorised"],"acf":[],"_links":{"self":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts\/7119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/users\/374"}],"replies":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/comments?post=7119"}],"version-history":[{"count":0,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts\/7119\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/media\/3036"}],"wp:attachment":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/media?parent=7119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/categories?post=7119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/tags?post=7119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}