{"id":3212,"date":"2021-12-06T18:12:33","date_gmt":"2021-12-06T18:12:33","guid":{"rendered":"https:\/\/evblocks.com\/?p=3047"},"modified":"2025-11-11T13:41:43","modified_gmt":"2025-11-11T13:41:43","slug":"wet-pour-concrete-v-pre-cast-ev-charger-foundations","status":"publish","type":"post","link":"https:\/\/evblocks.com\/uk\/blog\/wet-pour-concrete-v-pre-cast-ev-charger-foundations\/","title":{"rendered":"Wet Pour Concrete V Pre-Cast EV Charger Foundations"},"content":{"rendered":"<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<h1 class=\"wp-block-heading\">EV Charger Foundations<\/h1>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>When it comes to installing free standing EV charging points. Contractors face a choice between the tried and tested, but time-consuming wet pour concrete foundation; or the fast, efficient, and convenient <a href=\"https:\/\/evblocks.com\/product-range\/\">pre-cast EV charger foundation<\/a>.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>Here we look at the reasons why contractors may choose either one of these solutions and the implications this may have on their EV charger installation projects.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<h2 class=\"wp-block-heading\"><strong>Wet Pour Concrete EV Charger Foundations<\/strong><\/h2>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>The most frequently used installation method for a civils contractor is to create a concrete foundation using wet pour concrete.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>This is a tried and tested method, but it comes with challenges that can cause significant delays and generate additional costs.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>There is a need to wait for the concrete to dry before the installation is completed, meaning that contractors need to make a minimum of two site visits to complete the installation which can stretch between 48 hours to a week.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>In winter this delay can be exacerbated by the cold weather preventing the concrete curing, making it harder to manage the installation and related projects.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>Then there are risks around animal and accidental damage, human error and the inconsistent sizing that can come from a wet pour and the wooden shuttering used to contain it.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<h2 class=\"wp-block-heading\"><strong>Pre-Cast EV Charger Foundations<\/strong><\/h2>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>The alternative to this is a precast EV charger foundation block that removes the need for wet pour concrete.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>The system is designed to be suitable for same day installation as all that is required is the need to dig the hole, drop in the pre-cast foundation block and then connect the EV charger to the adaptor plate.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>A pre-cast EV charger foundation is designed to be a quick, efficient, and reliable way of installing EV charging points.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>Removing the need to wait for the concrete to dry, makes installations more consistent and easier to plan. The pre-cast base also provides a more consistent finish compared to the wet pour concrete base.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>The adaptor plate can be changed in line with updates to EV charging technology, helping to future-proof the installation and reduce future costs.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>Finally, an increased focus on reducing the carbon footprint of projects the hollow pre-cast block requires the use of less concrete than when a wet pour concrete base is implemented.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<h2 class=\"wp-block-heading\"><strong>Cost Comparison<\/strong><\/h2>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>The costs associated with a wet pour concrete foundation are the materials along with the labour to dig the hole and then complete the installation. For the EV blocks there is a fixed cost for the block plus the time for the contractor, who may not need to be a civils contractor to dig the hole.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>In the short term the costs are similar when using a wet pour concrete method to create a charger foundation compared to a pre-cast solution.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>However, the risk of delays, damage and inconsistent finishes mean that the cost advantage can quickly be lost. Particularly if the charger needs to be changed in the future.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<h2 class=\"wp-block-heading\"><strong>Overview<\/strong><\/h2>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>With the up-front cost of the base being mitigated by the risk of damage, error or bad weather leading to additional costs the choice is a straightforward choice.<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__container--no-vertical-space\">\n<p>Contractors have the choice between familiarity (wet pour concrete foundation) or convenience, consistency, and adaptability (Pre-cast foundation)<\/p>\n<\/section>\n\n<section class=\"evblocks__container evblocks__block evblocks__pattern\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>EV Charger Foundations When it comes to installing free standing EV charging points. Contractors face a choice between the tried and tested, but time-consuming wet pour concrete foundation; or the fast, efficient, and convenient pre-cast EV charger foundation. Here we&#8230;<\/p>\n","protected":false},"author":4,"featured_media":3217,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3212","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorised"],"acf":[],"_links":{"self":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts\/3212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/comments?post=3212"}],"version-history":[{"count":0,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/posts\/3212\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/media\/3217"}],"wp:attachment":[{"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/media?parent=3212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/categories?post=3212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evblocks.com\/uk\/wp-json\/wp\/v2\/tags?post=3212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}